SUNDERLAND FOOTBALL CLUB – FOUNDATION OF LIGHT

Sunderland Football Club Foundation of Light Logo

Conex were successful in being awarded the contract for the Foundation of Light's new Educational Centre site at Shildon, County Durham.

A full site wide installation of 240v power ring mains and Category 6 cabling infrastructure encompassing extensive 3-compartment dado trunking site-wide. Two additional main teaching suites were created where the addition of interactive whiteboards, ceiling mounted projectors and audio/visual multi-port wall plates were also commissioned.

Also installed was a multi-user Videx colour video door entry security system to fit in with the existing ground floor and first floor receptionists. Site-wide Cisco wireless networks were designed and installed to allow for private and public usage

Our attention to detail, specifying of exceptional value for money goods and services backed up by extensive local support service meant we were chosen above even much larger companies.

Back to Top

DURHAM UNIVERSITY – PALANTINE GATEWAY & LIBRARY

DURHAM UNIVERSITY

CONEX were successful in continuing a 5 year working relationship with the construction company Laing O'Rourke who built the £66million new flagship facilities at Durham University. Conex were working with Laing's own in-house Crown House Technology (Cht) and we were contracted to provide over 3,000 Category 6 data ports, 60Km of resilient internal, campus and backbone fibre optics aswell as integrating existing voice circuits and services across the new buildings

Direct account management and dedicated on-site Project Engineer as engineering lead allowed us to encompass all ad-hoc in-build requests aswell as providing multi-contact support for site meetings, end client demonstrations, briefings and handover exercises.

Following these works Durham University contracted Conex direct to perform works at Law School directly commissioned by the Durham University Estate Management Team Leader.

Back to Top

OLYMPICS 2012 LOCOG – MEDIA CENTRE, NEWCASTLE UNITED FOOTBALL CLUB

London 2012

As part of the LOCOG sponsoring bid for Olympics 2012 Conex were contracted to install the new Media Centre contained within all the NG Bailey's scope of works in readying the Sports Direct Arena in Newcastle for the Olympic Football Tournament

The solution encompassed the upgrade and installation of over 1,000 data points for voice/data integration and over 40 Kilometres of multimode fibre optic cables. Over 40 data cabinets were strategically positioned to allow all multimedia and associated IP services to be ready on time and in budget.

We were congratulated directly by LOCOG due to the very small window of time given to carry out major IT works from the end of the domestic Premier League season to the Olympics starting only 8 weeks later.

Back to Top

ROYAL GRAMMAR SCHOOL, NEWCASTLE UPON TYNE

Royal Grammer School, Newcastle Upon Tyne

Conex undertook a 2 year phased programme of a full campus wide upgrade to the school's network to provide a new Category 6 infrastructure. This foundation was to form the basis of the next generation networks of multimedia applications and wireless provisioning in use around the full school site and grounds.

Conex project engineers worked in conjunction with the school's IT team and estates business management personnel in order to implement key services and negating any loss of service or downtime at all times.

With the emphasis on good design and quality of installation a first rate project was fully implemented.

Back to Top

BREAGH PIPELINE – MARINE FIBRE OPTIC

Breagh Pipeline - Marine Fibre Optic

Working for SPIE, Murphy and PX Limited as a joint project Conex were drafted in for the specialised fibre splicing and terminations involved on the marine grade fibre optic cabling. Supplying offshore-accredited personnel Conex were responsible for splicing the pipeline fibre optic cables 30 kilometres over land and over 100 kilometres under the North Sea.

The cables were fully OTDR tested for a right first time approach. A number of changes were also implemented working over a Bank Holiday weekend to assist with pipeline communications actioned to be going live on an extreme time critical date.

Back to Top

NORTHUMBRIA POLICE – TACTICAL TRAINING UNIT

Northumbria Police

Working with full Conex SC cleared employees performed a full site IT infrastructure for the new Tactical Firearms training facility. Working with the Police's IT team under the principal contractor Kier Construction a purpose-built specialist IT Category 6 and fibre installation was implemented.

Conex have also supported and maintained every Northumbria Police & Durham Police site in the respective Authorities for over two decades.

Back to Top

SKY BROADCASTING HANDS ON PROJECTS

Sky

For over 8 years Conex are responsible for provisioning of comms lines and structured cabling to over 3,500 Sky kiosks throughout the British Isles.

SKY Retail is right at the forefront of SKY's commercial business and is very important to their installed base of SKY subscriber services. Our engineers carry out extensive works out of hours in many retail and shopping centres working alongside nominated project staff.

Currently we are jointly undertaking the SKY 3D Stand upgrade project which will see our skilled services be extended to the footprint of Europe